Talk to our expert online, or call +372 605 4895
4624 houses made since 1995
Germany3

Germany#3

2 Floors
3 Bedrooms
2 Bathrooms
198.5 m² Total area
121.6 m² Living area
15.9 m² Terrace/balcony area

GERMANY#3 IS A ROBUST TWO STOREY PREFAB HOUSE DESIGNED FOR BOTH PRIVACY AND SOCIAL INTERACTIONS, IDEAL FOR FAMILY LIFE.

GERMANY#3 is a terrific, robust but welcoming residence which will perfectly suit families looking for luminous open space and harmony.

A lovely doorstep, protected by a roof and beautiful panels on both sides, invites to enter the house into the engaging 15 m² hallway. The hall leads to the different house areas as well as many storage spaces, useful for winter or for house equipment.
The main room offers a pleasing living space which can easily be furnished with sitting and dining areas, both overlooking the L-shaped open kitchen. A pantry, located behind the kitchen, increases the functionality of the house. A fireplace can also be designed to complete the layout. A compact terrace integrated in the house structure nicely links the indoors with the outdoors.

The house benefits from a bedroom downstairs, adjacent to a bathroom, and the same layout can be found upstairs.
Climbing the stairs, a 20 m² area with openings can be used as a lounge or office area. In addition, a separate wardrobe and a closet are available for more organisation and storage purposes. The last bedroom on the first floor comes along with a walk-in closet and a private covered balcony.

This property will certainly satisfy the expectations of contemporary home lovers and families thanks to its feeling of space, everyday comfort, luminosity and functionalities. It can absolutely correspond to a beautiful family project.

We use 100% renewable energy
CE Strength Graded Structural Timber
FSC
ISO 9001
Accredited by the United Kingdom Accreditation Service
Green Energy 100%

Get Pricing

Get an instant quote for full price info and details below.

Instant, 3-second price quote!

"*" indicates required fields

Title
Newsletter
This field is for validation purposes and should be left unchanged.

  • Robust house with character
  • Beautiful volumes and large windows
  • Many storages
  • Covered terrace, balcony and doorstep

Technical information

Number of bathrooms
2
Number of bedrooms
3
Number of floors
2
All year residence option
Has balcony
Has fireplace
Has garage
Has sauna
Has terrace/balcony
Has utility room
Has wardrobe
Total area
198.5 m²
Living area
121.6 m²
Terrace/balcony area
15.9 m²

Similar Houses

France3

France#3

  • Floors: 2
  • Total area: 181.5 m²
  • Living area: 126.3 m²
  • Bedrooms: 3
  • Bathrooms: 2
  • Terrace/balcony area: 33.5 m²
Finland3

Finland#3

  • Floors: 2
  • Total area: 184.4 m²
  • Living area: 104.9 m²
  • Bedrooms: 3
  • Bathrooms: 2
  • Terrace/balcony area: 35 m²

Testimonials

Family Ranna Log home

We selected Palmatin because we had already ordered 1 log house previously and we are very satisfied with it.

Log home Margus

The role of Sales consultant was very important. Your competitors (we tried three-four producers) sales consultants weren’t adequate. Palmatin sales consultant was very helpful and we always got information that we needed. The whole selling process was made professionally and this was the main reason why we selected Palmatin.

Wall types

  • Stone facade

    It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.

  • Rendered facade

    It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.

  • Wooden boarding

    With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.

Three different price levels

  • Basic

    Basic – includes drawings for the log part, log part of the house, T-battens for openings, hydro isolation between the foundation and first log row, wooden dowels, isolation between the logs, special metallic parts and packages to be delivered in the order of assembly. The Basic kit is suitable if you wish to buy only the walls of the house and build the rest of the house yourself.

  • Standard

    Standard – in addition to the Basic kit, this kit includes rafters, roof hydro isolation, ventilation slats, sarking, first floor joists, balcony joists, windows, exterior doors and special metallic accessories. The Standard kit is suitable if you wish to get a weatherproof house quickly and then continue with interior works in your own pace.

  • Premium

    Premium  – in addition to the Standard kit, this kit includes all other wooden materials needed to finish the house, interior doors and a staircase. The Premium kit is the most comfortable kit, including all wooden materials needed to build a house. This is suitable if you wish to finish the house quickly without spending time worrying about the quantity or availability of materials.

Consult a construction expert

Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!

  • This field is for validation purposes and should be left unchanged.

Marko Valler

+372 605 48 95

Frequently Asked Questions

Do you propose the construction on the site?

Building a house is never an insignificant challenge. If you feel adventurous, possess some experience in construction or want to learn by doing, you can assemble the house yourself. Take a look at the different house packages and decide of the degree of work you want to handle. If desired by the clients, we can also support you during the construction project. Our partners located in different countries can assist you during all the phases of the house construction, from the foundations to the house assembly, including other special works. If needed, we can send one of our specialists to supervise the construction site. In more rare cases, a team of experts from the factory takes in charge of the building work on the site.

Is it cheaper to order a ready made log home kit / model or making my home from scratch?

The price of a log house or a prefabricated house is based on the quantity of material necessary to build the house, influenced by its size. Therefore, the modification of a house model or personalized plans will not apply a substantial cost increase to the price compared to a home kit. Concretely, a similar personalized plan or a model kit can have similar prices. Likewise, switching the bedroom and kitchen located on a house model won’t impact dramatically the final price of the house.

What are the house elements that you build in your factory?

At Palmatin, we think that quality products depend on the production management and material transformations. We manage and supervise our production with great attention. That is why we prepare all the wooden elements of the log houses and prefabricated houses at the factory. That includes the logs, the doors and windows frames, the interior walls, the wooden flooring for terraces and balconies, etc…

What are the different steps when I buy a house with Palmatin?

You think about building your house, and you are ready to move forward with this beautiful project? Here are the steps when buying a house with Palmatin. First, contact us to discuss your project, needs and expectations. Based on your requirements, we establish an accurate quotation. If you accept the project, we agree and start working on the design and drawings. We carefully inspect all the technical aspects and engineering details of the construction. If you are satisfied, we launch the production of the house at our factory. After a few months from the project start, the house is ready and transported to the construction site, where it will be assembled during few weeks only.