Talk to our expert online, or call +372 605 4895
4594 houses made since 1995

Aleks

1 Floors
0 Bedrooms
1 Bathrooms
22.4 m² Total area
22.4 m² Living area
0 m² Terrace/balcony area

Aleks is a lovely smaller log sauna with a pool.

This is a great place for spending time with friends. Entering the house there is a cosy lounge with a fireplace. The sauna is nice and roomy and you can cool yourself in the pool.

We use 100% renewable energy
CE Strength Graded Structural Timber
FSC
ISO 9001
Accredited by the United Kingdom Accreditation Service
Green Energy 100%

Get Pricing

Get an instant quote for full price info and details below.

Instant, 3-second price quote!

"*" indicates required fields

Title
Newsletter
This field is for validation purposes and should be left unchanged.

  • A Pool
  • Cosy Lounge with Fireplace

Floor plans

Technical information

Number of bathrooms
1
Number of bedrooms
0
Number of floors
1
All year residence option
Has balcony
Has fireplace
Has garage
Has sauna
Has terrace/balcony
Has utility room
Has wardrobe
Total area
22.4 m²
Living area
22.4 m²
Terrace/balcony area
0 m²

Similar Houses

Siim

  • Floors: 1
  • Total area: 15.9 m²
  • Living area: 15.9 m²
  • Bathrooms: 1
  • Terrace/balcony area: 6.9 m²

Tiit

  • Floors: 2
  • Total area: 37.2 m²
  • Living area: 27.5 m²
  • Bedrooms: 1
  • Bathrooms: 1
  • Terrace/balcony area: 15.13 m²

Testimonials

foundations
PALMATIN CUSTOMER STORY

PALMATIN CUSTOMER STORY

Log home Margus

The role of Sales consultant was very important. Your competitors (we tried three-four producers) sales consultants weren’t adequate. Palmatin sales consultant was very helpful and we always got information that we needed. The whole selling process was made professionally and this was the main reason why we selected Palmatin.

Wall types

  • Stone facade

    It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.

  • Rendered facade

    It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.

  • Wooden boarding

    With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.

Three different price levels

  • Basic

    Basic – includes drawings for the log part, log part of the house, T-battens for openings, hydro isolation between the foundation and first log row, wooden dowels, isolation between the logs, special metallic parts and packages to be delivered in the order of assembly. The Basic kit is suitable if you wish to buy only the walls of the house and build the rest of the house yourself.

  • Standard

    Standard – in addition to the Basic kit, this kit includes rafters, roof hydro isolation, ventilation slats, sarking, first floor joists, balcony joists, windows, exterior doors and special metallic accessories. The Standard kit is suitable if you wish to get a weatherproof house quickly and then continue with interior works in your own pace.

  • Premium

    Premium  – in addition to the Standard kit, this kit includes all other wooden materials needed to finish the house, interior doors and a staircase. The Premium kit is the most comfortable kit, including all wooden materials needed to build a house. This is suitable if you wish to finish the house quickly without spending time worrying about the quantity or availability of materials.

Consult a construction expert

Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!

  • This field is for validation purposes and should be left unchanged.

Jaan Köönvere

+372 605 48 95

Frequently Asked Questions

Is the size of the log house limited by the length of the logs?

The length of the logs do not limit the house dimensions. Thanks to various engineering solutions, such as details and finger joints, the wall sizes can vary as needed. Therefore, the house design can be very different and original from one construction to another. However, the lengths of materials are constrained by transportation rules and size restrictions.

Can I build the log house myself?

If you are looking for adventure and enriching experience, you can, of course, decide to build the log house by yourself. The construction on site consists of assembling the different elements, following the instructions. Our advice would be to consider in advance all the positive and negative aspects to not underestimate the work before starting. You can contact us for advice and assistance at any step of the assembly.

Can my house be built from my own plan?

We are always pleased to realize the house dream of our clients. Therefore, a Palmatin house model can be used as well as personal house plans. Indeed, many of our projects clients are based on their own models. Contact us to discuss and realize your own project. You can share your floor and house plans with us, or work on the drawings together.

How long does it take from the date of the order to delivery?

The period between the start of a house project and the delivery on the construction site is specific to each project as many elements can influence the duration, such as the house changes and validation of details, the rapidity of exchanges between Palmatin teams and the clients, the size of the project, etc.. In average, we consider that the preliminary phases of the project, including the discussion of the clients ideas and wishes, the budgetisation, agreement, drawings, design and technical details up to the validation before production last 5 weeks. Depending on the house type, the production is taking between 8 to 12 weeks. Besides, you can add a few weeks for the house shipment and delivery.