Puhkus is a beautiful summerhouse ideal for a couple or small family.
On the ground floor there is a spacious well-lighted living room, which is connected to the kitchen and dining area. Next to the living room is the sauna complex including the sauna, bathroom and separate restroom. The master bedroom is also on the ground floor.
On the first floor is a lovely lounge overviewing the living room downstairs. This lounge is perfect for spending quality time with friends or family. It can also be transformed to an office or an extra bedroom.
Get an instant quote for full price info and details below.
Instant, 3-second price quote!
"*" indicates required fields
We have already suggested Palmatin to many people who came to see the house while we were building it up. Everybody who saw the house liked it very much. We are very satisfied how the services were provided; we always had necessary information about our order.
We selected Palmatin because we had already ordered 1 log house previously and we are very satisfied with it.
It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.
It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.
With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.
Basic – includes drawings for the log part, log part of the house, T-battens for openings, hydro isolation between the foundation and first log row, wooden dowels, isolation between the logs, special metallic parts and packages to be delivered in the order of assembly. The Basic kit is suitable if you wish to buy only the walls of the house and build the rest of the house yourself.
Standard – in addition to the Basic kit, this kit includes rafters, roof hydro isolation, ventilation slats, sarking, first floor joists, balcony joists, windows, exterior doors and special metallic accessories. The Standard kit is suitable if you wish to get a weatherproof house quickly and then continue with interior works in your own pace.
Premium – in addition to the Standard kit, this kit includes all other wooden materials needed to finish the house, interior doors and a staircase. The Premium kit is the most comfortable kit, including all wooden materials needed to build a house. This is suitable if you wish to finish the house quickly without spending time worrying about the quantity or availability of materials.
Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!
Jaan Köönvere
+372 605 48 95
The period between the start of a house project and the delivery on the construction site is specific to each project as many elements can influence the duration, such as the house changes and validation of details, the rapidity of exchanges between Palmatin teams and the clients, the size of the project, etc.. In average, we consider that the preliminary phases of the project, including the discussion of the clients ideas and wishes, the budgetisation, agreement, drawings, design and technical details up to the validation before production last 5 weeks. Depending on the house type, the production is taking between 8 to 12 weeks. Besides, you can add a few weeks for the house shipment and delivery.
All the wood used in our constructions is dried in our factory. The kiln drier ensures the removal of water and moisture in the wood. If the wood is not dried, the house structure can be damaged by distortions and swelling of the materials.
You think about building your house, and you are ready to move forward with this beautiful project? Here are the steps when buying a house with Palmatin. First, contact us to discuss your project, needs and expectations. Based on your requirements, we establish an accurate quotation. If you accept the project, we agree and start working on the design and drawings. We carefully inspect all the technical aspects and engineering details of the construction. If you are satisfied, we launch the production of the house at our factory. After a few months from the project start, the house is ready and transported to the construction site, where it will be assembled during few weeks only.
The constructions obligations can vary from a country to another. Generally speaking, when the building exceeds a certain size, the construction is subject to a permit. This concerns private properties as well. Before delivering a construction permit, the plans of the house, the location, the environment, the public safety and other factors will be analyzed. To know about the regulations, you should refer to your local administration. Make sure to obtain the building permit before starting the construction on the site.