The beautiful two-storey log house Milla is great for the countryside but with the right exterior solutions also suitable for suburban areas.
In front of the house there is a large terrace. Entering the house there is a lovely dining area with a fireplace. The dining room is connected to the living room and kitchen on each side, making it a comfortable and spacious area. Also on the ground floor there is a bedroom and large bathroom. The second terrace behind the house can be accessed from the hall.
Coming up from the stair there is a cosy vestibule. Also on the first floor there are 2 more bedrooms and a second bathroom. Both bedrooms have access to the balcony.
Get an instant quote for full price info and details below.
Instant, 3-second price quote!
"*" indicates required fields
We selected Palmatin thanks to fast feedback and informational webpage. There were a lot of house plans and projects. Many other log house companies didn’t offer drawings. We asked price offers from 7 to 8 companies and only received two price offers – one was from Palmatin.
We selected Palmatin because we had already ordered 1 log house previously and we are very satisfied with it.
It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.
It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.
With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.
Basic – includes drawings for the log part, log part of the house, T-battens for openings, hydro isolation between the foundation and first log row, wooden dowels, isolation between the logs, special metallic parts and packages to be delivered in the order of assembly. The Basic kit is suitable if you wish to buy only the walls of the house and build the rest of the house yourself.
Standard – in addition to the Basic kit, this kit includes rafters, roof hydro isolation, ventilation slats, sarking, first floor joists, balcony joists, windows, exterior doors and special metallic accessories. The Standard kit is suitable if you wish to get a weatherproof house quickly and then continue with interior works in your own pace.
Premium – in addition to the Standard kit, this kit includes all other wooden materials needed to finish the house, interior doors and a staircase. The Premium kit is the most comfortable kit, including all wooden materials needed to build a house. This is suitable if you wish to finish the house quickly without spending time worrying about the quantity or availability of materials.
Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!
Jaan Köönvere
+372 605 48 95
As a log and prefabricated house producer, we value the environment and the nature, quality and durable products. Our goal is to participate to a sustainable future. We provide comfort and value the health of our clients and their satisfaction. We manage our supply and our production with careful attention, and we place our clients at the very heart of our concern.
The prefabricated house is built by assembling on the construction site the prefabricated house elements produced in the factory. Once the assembly is achieved, the exterior and interior of the house can be decorated freely. Outside, you can select wooden cladding, plaster facade elements, stone imitation, mosaic or plastered mineral insulation. The interior can be decorated with paint, wallpaper, wood, stone and any other type of finishing. Wood, carpet flooring, tiles and flexible flooring can be used for the floor, among other materials. Many elements can also be suitable for the ceiling. Discover some options of interior finishing in our catalogue: “Additional elements and accessories“.
The period between the start of a house project and the delivery on the construction site is specific to each project as many elements can influence the duration, such as the house changes and validation of details, the rapidity of exchanges between Palmatin teams and the clients, the size of the project, etc.. In average, we consider that the preliminary phases of the project, including the discussion of the clients ideas and wishes, the budgetisation, agreement, drawings, design and technical details up to the validation before production last 5 weeks. Depending on the house type, the production is taking between 8 to 12 weeks. Besides, you can add a few weeks for the house shipment and delivery.
Thanks to building methods, modular – or prefabricated houses – are remarkable in term of energy saving. This type of construction gives the possibility to choose alternative energy power sources and environment-friendly installations. The effective insulation will also guarantee you a pleasant interior climate and the reduction of energy bills.