Talk to our expert online, or call +372 605 4895
4644 houses made since 1995

Hommik

2 Floors
2 Bedrooms
1 Bathrooms
127 m² Total area
90 m² Living area
32 m² Terrace/balcony area

This house with two bedrooms and a loft is suitable for a smaller family.

The ground floor is a kitchen-living room, hallway with stairs to the second floor, toilet, steam bath, showers, changing rooms and technical rooms.

From the living room can be accessed on the large terrace. Room is decorated with large windows and opens to the roof of the gallery.

The second floor includes one big room, which can be used as a bedroom.

We use 100% renewable energy
CE Strength Graded Structural Timber
FSC
ISO 9001
Accredited by the United Kingdom Accreditation Service
Green Energy 100%

Get Pricing

Get an instant quote for full price info and details below.

Instant, 3-second price quote!

"*" indicates required fields

Title
This field is hidden when viewing the form
Newsletter
This field is for validation purposes and should be left unchanged.

  • A Compact and Comfortable Design
  • Sauna & Lounge Included

Technical information

Number of bathrooms
1
Number of bedrooms
2
Number of floors
2
All year residence option
Has balcony
Has fireplace
Has garage
Has sauna
Has terrace/balcony
Has utility room
Has wardrobe
Total area
127 m²
Living area
90 m²
Terrace/balcony area
32 m²

Similar Houses

Milla

  • Floors: 2
  • Total area: 157.7 m²
  • Living area: 128.9 m²
  • Bedrooms: 3
  • Bathrooms: 2
  • Terrace/balcony area: 34.8 m²

Sirel

  • Floors: 2
  • Total area: 152.2 m²
  • Living area: 122.6 m²
  • Bedrooms: 3
  • Bathrooms: 2
  • Terrace/balcony area: 33.4 m²

Testimonials

foundations
PALMATIN CUSTOMER STORY

PALMATIN CUSTOMER STORY

Family Nõupuu (Log home Noupuu)

We have already suggested Palmatin to many people who came to see the house while we were building it up. Everybody who saw the house liked it very much. We are very satisfied how the services were provided; we always had necessary information about our order.

Wall types

  • Stone facade

    It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.

  • Rendered facade

    It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.

  • Wooden boarding

    With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.

Three different price levels

  • Basic

    Basic – includes drawings for the log part, log part of the house, T-battens for openings, hydro isolation between the foundation and first log row, wooden dowels, isolation between the logs, special metallic parts and packages to be delivered in the order of assembly. The Basic kit is suitable if you wish to buy only the walls of the house and build the rest of the house yourself.

  • Standard

    Standard – in addition to the Basic kit, this kit includes rafters, roof hydro isolation, ventilation slats, sarking, first floor joists, balcony joists, windows, exterior doors and special metallic accessories. The Standard kit is suitable if you wish to get a weatherproof house quickly and then continue with interior works in your own pace.

  • Premium

    Premium  – in addition to the Standard kit, this kit includes all other wooden materials needed to finish the house, interior doors and a staircase. The Premium kit is the most comfortable kit, including all wooden materials needed to build a house. This is suitable if you wish to finish the house quickly without spending time worrying about the quantity or availability of materials.

Consult a construction expert

Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!

  • This field is for validation purposes and should be left unchanged.

Jaan Köönvere

+372 605 48 95

Frequently Asked Questions

How is a wooden house made?

A wooden log house is made by overlaying wooden log, following specific instructions and order of assembly. At the factory, the logs are cut at the right dimensions and angles and in proper number. All the special cuts and notches necessary for the assembly on the construction site are also pre-cut. To read more about the log house materials and construction, you can visit the “technologies” category of the website menu.

How much does a wooden house cost?

Many elements impact the price of a house, therefore it is complicated to establish a price without detailing the project. Generally speaking, the price of a log house is influenced by the type of logs, the insulation and choice of materials, the size of the house and construction in the factory, the architecture complexity and the choice of the building package. However, you can consider that one square metre (1m² = 10.7 sq.feet) of floor area costs between 500 to 1200€.

What is the VAT percentage?

Like any other consumption goods, the VAT applied to the house cost is 20%.

How long does it take to deliver the house to the construction site?

Many factors can influence the duration of transportation and date of shipment and delivery. The transportation mean, the location of delivery, the weather, the road traffic and other unpredictable events can impact the transportation duration. In Europe and unless specific conditions apply, a driver is not allowed to drive more than 6 consecutive hours. At maximum, he can work 9 hours per day, 10 hours per night. Per week, a driver is limited to 48hours in average. At Palmatin, we organize  the transportation of the materials so you can receive all the materials to the construction site as planned.