This house with two bedrooms and a loft is suitable for a smaller family.
The ground floor is a kitchen-living room, hallway with stairs to the second floor, toilet, steam bath, showers, changing rooms and technical rooms.
From the living room can be accessed on the large terrace. Room is decorated with large windows and opens to the roof of the gallery.
The second floor includes one big room, which can be used as a bedroom.
Get an instant quote for full price info and details below.
Instant, 3-second price quote!
"*" indicates required fields
PALMATIN CUSTOMER STORY
We have already suggested Palmatin to many people who came to see the house while we were building it up. Everybody who saw the house liked it very much. We are very satisfied how the services were provided; we always had necessary information about our order.
It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.
It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.
With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.
Basic – includes drawings for the log part, log part of the house, T-battens for openings, hydro isolation between the foundation and first log row, wooden dowels, isolation between the logs, special metallic parts and packages to be delivered in the order of assembly. The Basic kit is suitable if you wish to buy only the walls of the house and build the rest of the house yourself.
Standard – in addition to the Basic kit, this kit includes rafters, roof hydro isolation, ventilation slats, sarking, first floor joists, balcony joists, windows, exterior doors and special metallic accessories. The Standard kit is suitable if you wish to get a weatherproof house quickly and then continue with interior works in your own pace.
Premium – in addition to the Standard kit, this kit includes all other wooden materials needed to finish the house, interior doors and a staircase. The Premium kit is the most comfortable kit, including all wooden materials needed to build a house. This is suitable if you wish to finish the house quickly without spending time worrying about the quantity or availability of materials.
Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!
Jaan Köönvere
+372 605 48 95
A wooden log house is made by overlaying wooden log, following specific instructions and order of assembly. At the factory, the logs are cut at the right dimensions and angles and in proper number. All the special cuts and notches necessary for the assembly on the construction site are also pre-cut. To read more about the log house materials and construction, you can visit the “technologies” category of the website menu.
Many elements impact the price of a house, therefore it is complicated to establish a price without detailing the project. Generally speaking, the price of a log house is influenced by the type of logs, the insulation and choice of materials, the size of the house and construction in the factory, the architecture complexity and the choice of the building package. However, you can consider that one square metre (1m² = 10.7 sq.feet) of floor area costs between 500 to 1200€.
Like any other consumption goods, the VAT applied to the house cost is 20%.
Many factors can influence the duration of transportation and date of shipment and delivery. The transportation mean, the location of delivery, the weather, the road traffic and other unpredictable events can impact the transportation duration. In Europe and unless specific conditions apply, a driver is not allowed to drive more than 6 consecutive hours. At maximum, he can work 9 hours per day, 10 hours per night. Per week, a driver is limited to 48hours in average. At Palmatin, we organize the transportation of the materials so you can receive all the materials to the construction site as planned.