Talk to our expert online, or call +372 605 4895
4594 houses made since 1995

Camping Cabin 1

1 Floors
2 Bedrooms
1 Bathrooms
26.3 m² Total area
26.3 m² Living area
8.68 m² Terrace/balcony area

This is a lovely log cabin with all comforts to make camping even more enjoyable.

In front of the cabin is a terrace ideal for outdoor dining. Inside is a spacious living room connected to an open kitchen. From the kitchen you can access the bathroom. There are 2 bedrooms the cabin.

We use 100% renewable energy
CE Strength Graded Structural Timber
FSC
ISO 9001
Accredited by the United Kingdom Accreditation Service
Green Energy 100%

Get Pricing

Get an instant quote for full price info and details below.

Instant, 3-second price quote!

"*" indicates required fields

Title
Newsletter
This field is for validation purposes and should be left unchanged.

  • 2 Bedrooms - Ideal for a Small Family
  • Lovely Terrace for Outdoor Dining

Floor plans

Technical information

Number of bathrooms
1
Number of bedrooms
2
Number of floors
1
All year residence option
Has balcony
Has fireplace
Has garage
Has sauna
Has terrace/balcony
Has utility room
Has wardrobe
Total area
26.3 m²
Living area
26.3 m²
Terrace/balcony area
8.68 m²

Similar Houses

Camping Cabin 2

  • Floors: 1
  • Total area: 34.4 m²
  • Living area: 34.4 m²
  • Bedrooms: 2
  • Bathrooms: 1
  • Terrace/balcony area: 7.32 m²

Lars 3

  • Floors: 1
  • Total area: 49.1 m²
  • Living area: 49.1 m²
  • Bedrooms: 2
  • Bathrooms: 1
  • Terrace/balcony area: 10.85 m²

Testimonials

Family Nõupuu (Log home Noupuu)

We have already suggested Palmatin to many people who came to see the house while we were building it up. Everybody who saw the house liked it very much. We are very satisfied how the services were provided; we always had necessary information about our order.

foundations
PALMATIN CUSTOMER STORY

PALMATIN CUSTOMER STORY

Wall types

  • Stone facade

    It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.

  • Rendered facade

    It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.

  • Wooden boarding

    With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.

Three different price levels

  • Basic

    Basic – includes drawings for the log part, log part of the house, T-battens for openings, hydro isolation between the foundation and first log row, wooden dowels, isolation between the logs, special metallic parts and packages to be delivered in the order of assembly. The Basic kit is suitable if you wish to buy only the walls of the house and build the rest of the house yourself.

  • Standard

    Standard – in addition to the Basic kit, this kit includes rafters, roof hydro isolation, ventilation slats, sarking, first floor joists, balcony joists, windows, exterior doors and special metallic accessories. The Standard kit is suitable if you wish to get a weatherproof house quickly and then continue with interior works in your own pace.

  • Premium

    Premium  – in addition to the Standard kit, this kit includes all other wooden materials needed to finish the house, interior doors and a staircase. The Premium kit is the most comfortable kit, including all wooden materials needed to build a house. This is suitable if you wish to finish the house quickly without spending time worrying about the quantity or availability of materials.

Consult a construction expert

Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!

  • This field is for validation purposes and should be left unchanged.

Jaan Köönvere

+372 605 48 95

Frequently Asked Questions

What preparation to make on the construction site before the assembly of the house?

Before starting the assembly of the house, and even before receiving the delivery, it is primordial to check that the construction site is correctly prepared. Always check the security of the site for workers. The construction site has to be clean and the storage area prepared. You may also verify that the site is delimited and protected, to stop anyone not related to work from entering the construction site.

How long does it take to deliver the house to the construction site?

Many factors can influence the duration of transportation and date of shipment and delivery. The transportation mean, the location of delivery, the weather, the road traffic and other unpredictable events can impact the transportation duration. In Europe and unless specific conditions apply, a driver is not allowed to drive more than 6 consecutive hours. At maximum, he can work 9 hours per day, 10 hours per night. Per week, a driver is limited to 48hours in average. At Palmatin, we organize  the transportation of the materials so you can receive all the materials to the construction site as planned.

Are the transportation costs included in the price of the houses?

You can have a look at a house details and its price by filling the form on the right side of the model page on our website. An email containing all the information will be sent to you. The prices indicated in the documents do not include the transportation price. The transportation price depends on the quantity of material to transport, the number of trucks and the location of the construction site. Therefore, the information document available on our website only concerns the house itself.

How much does it costs to have the manufacturer build the house?

The erection costs are directly related to the amount of work needed and to the location of the new house. When doing primary calculations, you should consider the costs to be around 30% (+-5%) of the house price.