Talk to our expert online, or call +372 605 4895
4634 houses made since 1995
Germany2

Germany#2

1 Floors
2 Bedrooms
1 Bathrooms
104.3 m² Total area
79.5 m² Living area
25.1 m² Terrace/balcony area

GERMANY#2 IS AN ATYPICAL SINGLE STOREY HOUSE BATHED IN LIGHT.

Germany#2 is a charming single level prefabricated house divided into two main areas. The vast living area is accessible from the outside via a practical vestibule and is composed of a functional integrated l-shaped kitchen open to spacious dining and sitting areas. A fireplace, perfect for cold winter evenings and to gather people in a jovial atmosphere, can be included to warm up the room.

Alongside the wall of the living room stands a beautiful terrace, leading also to the entrance door, which can be decorated with seats, garden furniture or various plants.

The night quarters, where two roomy bedrooms are separated by a utilitarian bathroom, is accessible from the living room through a 14 m² hallway, insuring quiet and privacy. The hallway also leads to separate facilities, a wardrobe and a storage area.

The atypical assets of this home are the large glass surfaces in the living room and the bedrooms, stretching from floor to ceiling, giving the house character and modernity and completing the charming look of this ground floor. They provide plenty of light all day long and a broad overview on the outdoors, giving a sensation of additional space and connection with the garden.

As a prefabricated house, the interior is adjustable. The exterior can also be customised with several finishing and integrates to an urban environment as well as a more private neighbourhood.

We use 100% renewable energy
CE Strength Graded Structural Timber
FSC
ISO 9001
Accredited by the United Kingdom Accreditation Service
Green Energy 100%

Get Pricing

Get an instant quote for full price info and details below.

Instant, 3-second price quote!

"*" indicates required fields

Title
Newsletter
This field is for validation purposes and should be left unchanged.

  • One side terrace
  • Wide openings and brightness
  • Separate night area
  • Cachet and modernity

Floor plans

Technical information

Number of bathrooms
1
Number of bedrooms
2
Number of floors
1
All year residence option
Has balcony
Has fireplace
Has garage
Has sauna
Has terrace/balcony
Has utility room
Has wardrobe
Total area
104.3 m²
Living area
79.5 m²
Terrace/balcony area
25.1 m²

Similar Houses

France2

France#2

  • Floors: 1
  • Total area: 99.8 m²
  • Living area: 77.1 m²
  • Bedrooms: 2
  • Bathrooms: 1
  • Terrace/balcony area: 15.7 m²
Estonia2

Estonia#2

  • Floors: 1
  • Total area: 101.4 m²
  • Living area: 81.7 m²
  • Bedrooms: 2
  • Bathrooms: 1
  • Terrace/balcony area: 13 m²

Testimonials

Family Roosve log house

We selected Palmatin thanks to fast feedback and informational webpage.  There were a lot of house plans and projects. Many other log house companies didn’t offer drawings. We asked price offers from 7 to 8 companies and only received two price offers – one was from Palmatin.

Family Ranna Log home

We selected Palmatin because we had already ordered 1 log house previously and we are very satisfied with it.

Wall types

  • Stone facade

    It is possible to use different stone materials as wall coverings. It is possible to choose from brick, decorative stone, etc. If you use stone as your external wall covering, a special cement board is installed on the prefabricated wall and the stone material will be installed thereupon on the site. In the case of stone covering, a wider foundation must be built to support the wall covering.

  • Rendered facade

    It is similar to a stone facade, a special cement board will be installed on the prefabricated walls. The rendering of the facade will take place on the site.

  • Wooden boarding

    With wooden facade you have many additional options. You may choose between different cladding profiles, types of wood and the manners of treatment of the wood (varnished, painted, impregnated, etc.) Treated wooden cladding will be installed on the prefabricated walls at the factory.

Three different price levels

  • Basic

    Basic – includes drawings for the log part, log part of the house, T-battens for openings, hydro isolation between the foundation and first log row, wooden dowels, isolation between the logs, special metallic parts and packages to be delivered in the order of assembly. The Basic kit is suitable if you wish to buy only the walls of the house and build the rest of the house yourself.

  • Standard

    Standard – in addition to the Basic kit, this kit includes rafters, roof hydro isolation, ventilation slats, sarking, first floor joists, balcony joists, windows, exterior doors and special metallic accessories. The Standard kit is suitable if you wish to get a weatherproof house quickly and then continue with interior works in your own pace.

  • Premium

    Premium  – in addition to the Standard kit, this kit includes all other wooden materials needed to finish the house, interior doors and a staircase. The Premium kit is the most comfortable kit, including all wooden materials needed to build a house. This is suitable if you wish to finish the house quickly without spending time worrying about the quantity or availability of materials.

Consult a construction expert

Do you have questions about the house or would like to consult about your next project? We'd be happy to answer all your questions!

  • This field is for validation purposes and should be left unchanged.

Marko Valler

+372 605 48 95

Frequently Asked Questions

How long does it take from the date of the order to delivery?

The period between the start of a house project and the delivery on the construction site is specific to each project as many elements can influence the duration, such as the house changes and validation of details, the rapidity of exchanges between Palmatin teams and the clients, the size of the project, etc.. In average, we consider that the preliminary phases of the project, including the discussion of the clients ideas and wishes, the budgetisation, agreement, drawings, design and technical details up to the validation before production last 5 weeks. Depending on the house type, the production is taking between 8 to 12 weeks. Besides, you can add a few weeks for the house shipment and delivery.

What preparation to make on the construction site before the assembly of the house?

Before starting the assembly of the house, and even before receiving the delivery, it is primordial to check that the construction site is correctly prepared. Always check the security of the site for workers. The construction site has to be clean and the storage area prepared. You may also verify that the site is delimited and protected, to stop anyone not related to work from entering the construction site.

How is a wooden house made?

A wooden log house is made by overlaying wooden log, following specific instructions and order of assembly. At the factory, the logs are cut at the right dimensions and angles and in proper number. All the special cuts and notches necessary for the assembly on the construction site are also pre-cut. To read more about the log house materials and construction, you can visit the “technologies” category of the website menu.

Do you use dry logs/ dry wood?

All the wood used in our constructions is dried in our factory. The kiln drier ensures the removal of water and moisture in the wood. If the wood is not dried, the house structure can be damaged by distortions and swelling of the materials.